Structural Monitoring
Request:
- Monitor Structural Movement in Road Bridges over a 12 month period
Methodology:
- Installation of Monitoring Prisms & routine monitoring with Leica TS30 Total Station by Two Surveyors
End Product:
- Records of 3D Structural Movement over the required time period
Download: ""
Back to Case Studies
[gallery ids="399,400,398"]